Understand the impacts.
What CMP’s Phase 1 would mean for private property, our schools, the places we share, the environment and what we all pay.
And this is only Phase 1. CMP says a Phase 2 filing will follow by Dec. 31, 2026. Petition, p. 8 ↗
Private property and rights-of-way
A corridor of wooden poles would become a high-voltage steel line.
These easements date from 1948–1954. In Falmouth, the corridor holds wooden poles 50 to 75 feet tall. CMP would add steel monopoles up to about 110 feet and clear it edge to edge. We believe that overburdens these rights-of-way, and neighbors should not carry the cost.
value impact on nearby properties in the comparable studies reviewed in Northern Pass testimony. Directional, not an appraisal.
The Town of Falmouth reports “some homes that are within 75 feet of the existing power lines.”
property-value criteria in the siting procedure CMP filed in this case.
The Town reports the Cumberland County Assessor “has stated that there will be an adverse impact on property values.” Town of Falmouth testimony, Item 197 ↗ · Northern Pass testimony ↗ · Registry of Deeds ↗ · AP01-001-018, EXM-004-004, EXM-004-001 Att. 1: case page, Data Requests tab ↗

Falmouth’s school campus
One shared campus, students ages 3 to 22.

from the existing lines to the outdoor baseball fields, by the Town’s estimate.
from the existing lines to the high school building, by the Town’s estimate.
“The project, as proposed, places an unacceptable burden on our school community.”
Falmouth Public Schools and School Board, to the Commission. They ask that CMP be required to reroute the lines away from the campus.
Town of Falmouth testimony, Item 197 ↗, Exhibits C, D, E · AP01-001-009: case page, Data Requests tab ↗
Public and communal spaces
The places we all share.
CMP’s corridor crosses conserved land, trails and rivers in town after town. In Falmouth, the Town says these places are “used by thousands of residents and visitors year-round.”
Falmouth
- 1McCrann Preserve
- 2Woods Road Community Forest
- 3River Point Conservation Area
- 4Pleasant Hill Preserve
- 5The Ledges Preserve
- 6Stormy Brook Preserve
- 7River’s Edge
Portland
- 8Presumpscot River Preserve
- 9Presumpscot River Trails
- 10Sebago to the Sea Trail
- 11Virginia Woods
- 12Evergreen Cemetery (National Register)
Westbrook
- 13Stroudwater River
- 14Stroudwater Trail
- 15Lovejoy Farm conservation land, about 130 feet from the line
Cumberland
- 16East Coast Greenway
Yarmouth
Elm Street substation work. State data shows no conserved land or trail crossed by the line.
At River Point, used for millennia as a campsite by Native Americans, work “would likely disturb and harm thousands of years of human history.”
Town of Falmouth testimony, Item 197 ↗ · Alliance review of State of Maine conserved lands, National Register and public trail data along CMP’s proposed route.
Environment
Streams, habitat and rare wildlife.
- 1Presumpscot River
- 2Piscataqua River
- 3East Branch Piscataqua River
- 4Mill Creek
- 5Meader Brook
- 6Johnson Branch
- 7Chenery Brook
- 8Minnow Brook
- 9Stroudwater River
large mapped wetlands crossed by the route.
known rare, threatened or endangered species occurrences in habitat the easement crosses in Falmouth: Least Bittern, Spotted Turtle and Wood Turtle.
The easement crosses several streams, creeks and the Presumpscot River. The Falmouth Land Trust warns that utility corridors often spread invasive species into protected areas.
Town of Falmouth testimony, Item 197 ↗ · AP01-001-014: case page, Data Requests tab ↗ · Streams and wetlands: Alliance review of public water and wetland maps along CMP’s proposed route.
Health and safety
Questions CMP hasn’t answered.
Herbicides
CMP’s plan filed with the state ↗ uses herbicide spraying on a roughly four-to-five-year cycle.
The plan that would govern this corridor was filed only as a confidential attachment, so the neighbors and schools next to it can’t review it.
EMF
CMP “has not performed a project-specific EMF assessment.”
The International Agency for Research on Cancer classified this type of exposure as a possible carcinogen in 2002. No causal link has been confirmed. Why hasn’t CMP shared the data for this line?
Wildfire
Maine’s climate scientists project “more than a doubling of fire probability in the state.”
Overhead lines can start fires when hardware wears out or trees fall into the wires.
We’re asking for a setback of 300 feet for above-ground high-voltage lines and 50 feet underground.
AP01-001-009, MAS-001-012: case page, Data Requests tab ↗ · What we know, and our sources ↗
Cost
And CMP customers pay for it.
CMP’s estimate for Phase 1 alone.
return on equity in CMP’s own cost model. CMP earns a return on what it builds.
CMP’s model also includes no operations and maintenance cost. Falmouth Public Schools has asked the Commission to require CMP to quantify the rate impact.
Petition, p. 43 ↗ · Town of Falmouth testimony, Item 197 ↗, Exhibit E · ODR-001-010 Att. 1: case page, Data Requests tab ↗
Put your impact on the record.
Document your property, estimate the potential value impact, or file a public comment.