Take action.
The Commission decides on what’s in the record, and town leaders listen to who shows up. Here’s how to be heard, in five minutes or on a Saturday.
Coming up
Show up in person.
Meeting dates as announced. Check posted agendas, and confirm docket dates on the case page ↗
Where you live
What’s happening in your town.
Map: approximate route, based on CMP’s filings.
Ways to help
Make your voice heard.
File a public comment
Your comment goes straight into the case record. No lawyer needed, and you don’t have to be a party.
Submit a comment ↗30 minDocument your property
Photos, a description and the impact in your own words.
How to document →One eveningSpeak at a council meeting
Talking points, dates and contacts for all five towns, and a draft email.
Get the guide ↓A SaturdayCanvass with us
We’ll pair you up and give you door-hangers.
Email to volunteer →5 min · FalmouthSign the setback petition
A 300-foot setback for above-ground high-voltage lines, 50 feet underground.
Read and sign →LandownersFile for intervenor status
The deadline has passed, but the Commission still accepts petitions showing good cause.
Get the guide ↓Your property
Put your impact on the record.
The Commission only weighs what’s actually filed. Send us three things, and use the estimator as a starting point.
Photos. A wide shot from your home toward the corridor; any window, porch, yard or driveway view; trees likely to be cleared; one shot with a person or vehicle for scale.
Your property. Acreage, current use, and notable features: well, septic field, gardens, trails, outbuildings, frontage.
The impact, in your words. Use of the land, quality of life, physical changes, and your own sense of value.
Within 300 feet, we assume the new towers and cleared corridor will be visible from your home or yard.
Will the towers or lines be visible from your home or main yard?
A rough starting point, not an appraisal. Rates from Northern Pass testimony. Read the report ↗
Falmouth residents
Sign the setback petition.
We ask the Town Council to adopt a 300-foot setback for above-ground high-voltage transmission lines, and a 50-foot setback for underground lines.
Read the full petition text
Central Maine Power has filed for state approval of its Greater Portland Transmission Upgrades Project (Maine PUC Docket No. 2025-00276), a massive, disruptive buildout of new and rebuilt high-voltage transmission lines running through Falmouth, Cumberland, Yarmouth, Westbrook and Portland. Many affected residents were never properly notified before the filing, and the project as proposed would allow new towers and lines to be sited close to homes and school properties with no protective buffer in place today.
The Town Council has already begun looking into this docket, and town representatives have signaled to representatives of our Alliance that they are willing to consider a more active role in protecting landowner rights and the rights of our community. In 2013 the Legislature considered a 300-foot setback for new power lines near homes and schools (LD 950). At the Energy and Utilities Committee’s request, the PUC reported that no state required a 300-foot setback, that it would not be feasible for distribution lines, and estimated it could cost about $950 million for CMP’s existing transmission system alone. The bill was not enacted (Maine PUC report, Docket 2013-00402, Nov. 30, 2013).
We ask the Town Council to take up and adopt a 300-foot setback for above-ground high-voltage transmission lines, and a 50-foot setback for underground lines, without delay, while the state’s review of this project is still underway and before any route or design is locked in.
Your representatives
A call, email or letter to your state rep or town council carries real weight on a case like this.
Help fund our technical and legal defense.
We’re an all-volunteer effort. Independent technical experts and legal counsel are what let us be heard in this docket.