Why this project needs an independent review.
CMP identifies the need, proposes the solution and earns a return on what it builds. A decision this large should not rest on that company’s word.
ODR-001-010 Att. 1, DOER-001-004: case page, Data Requests tab ↗
CMP’s incentive
The more CMP builds, the more it earns.
“That’s how the utility makes money … by making their rate of return on the capital investments that they have built.”
Public Advocate Heather Sanborn, Oct. 21, 2026. City meeting ↗
What CMP earns a return on
- New poles and wires
- New and expanded substations
- A bigger project, and a bigger base to earn on
What earns CMP nothing
- Lower demand and efficiency
- Solar, batteries and local generation owned by others
The return is only fair if the need is real. The Commission’s own independent management audit of CMP, reported in 2021, found an “overemphasis on closing earnings gaps.”
Liberty Consulting Group, 2021. Full audit ↗ · Bangor Daily News ↗
How CMP weighs alternatives
The same incentive shapes the route.
CMP’s parent company’s written procedure for choosing a project starts with the land the company already owns and favors whatever carries less “cost and risk to the project” itself. Nothing in it measures the net economic impact on the community. How CMP picks a route →
Iberdrola USA procedure (2015), filed by CMP as EXM-004-001 Att. 1, pp. 6, 15: case page, Data Requests tab ↗
Who checks the need
The state’s non-wires reviewer doesn’t check CMP’s forecast.
Load means the total electricity an area uses, which is a different question from whether today’s equipment holds up. CMP built its study on ISO New England’s 2024 forecast of load. The 2025 forecast cut 115 MW from the 2030 summer peak, and the 2026 forecast is lower still. Item 141 ↗
On the record
They are all questioning CMP’s need.
Maine Public Advocate
CMP’s practices “raise concerns that the Portland area forecast of load is overestimated, potentially leading to unneeded capital investment.”
Its witness asked the Commission to “direct an independent review” and “defer approval of forecast-driven portions” of the project.
City of Portland
Its primary concerns begin with “whether the need for the Project has been adequately demonstrated.”
“Alternate routes that avoid impacts on residences and conservation areas were not adequately studied.”
Town of Falmouth
The request to test CMP’s need “casts reasonable doubt on the underlying assumptions” in its load growth estimates.
Falmouth’s schools ask the Commission to “fully examine the project’s underlying need and scale.”
Item 143 ↗ · Town of Falmouth testimony, Item 197 ↗, Exhibit E
Conservation Law Foundation
“Properly evaluating CMP’s proposed transmission project first requires resolving this doubt about the estimated load growth.”
Town of Cumberland
The Town Council resolved on Nov. 9 to oppose the project as submitted.
It urged the Commission to “further examine the need and scale of the proposed improvements, consider practical alternative solutions and routes, including non-wires alternatives.” The Council directed the Town to file the resolution in the case.
What we’re asking for
Check the need. Then design to it.
Quotation: Public Advocate’s witness, Item 210 ↗.
Ask the Commission for an independent review.
Your public comment goes straight into the case record.